How Long Does a Home Remodel Take in Bloomington, IL | Landmark Construction

Written by Mark Johnson | Jan. 16, 2026

If you are considering a home remodel in Bloomington or Normal, one of the first questions you are likely asking is how long the project will take. This is one of the most common concerns Landmark Construction hears from local homeowners who want clarity before making a major investment in their home. While timelines vary, there are dependable averages that can help you plan with confidence.

The timeline for your remodel often depends on the age of your home, the level of customization, trade availability in Central Illinois, and the quality of planning done before construction begins. Landmark Construction utilizes a design-build approach that helps create more predictable schedules, so you know what to expect from the start.

What's in This Article

Average Remodeling Timelines in Bloomington-Normal

These estimated timelines reflect Landmark’s typical residential remodels and the types of homes commonly found across McLean County.

Kitchen Remodel Timeline

Typical Duration: 10 to 16 weeks

Kitchen remodels usually involve several trades working in sequence. Electrical updates, plumbing adjustments, flooring installation, cabinetry, and countertops all add layers to the schedule. Homes built from the 1980s through the early 2000s sometimes require updates behind the walls, which can add time. Careful planning during design and early selection decisions help shorten the construction phase.

Bathroom Remodel Timeline

Typical Duration: 8 to 14 weeks

Bathrooms are smaller spaces, but bathroom remodels can be deceptively complex. Tile installation, waterproofing, plumbing updates, and custom vanity selections all influence the schedule. Many Bloomington area homes have original plumbing that may need updating during the remodel. High end finishes or intricate tile layouts also extend the timeline.

Basement Finishing or Remodeling Timeline

Typical Duration: 10 to 20 weeks

Basements often include multiple zones such as entertainment areas, guest suites, gyms, or bathrooms. If a bathroom or wet bar is being added, this typically adds time due to plumbing and ventilation requirements. Older basements may also require moisture mitigation or electrical upgrades before walls can be closed. These steps are common in Central Illinois homes and part of why basement remodeling timelines vary.

Room Addition Timeline

Typical Duration: 14 to 28 weeks

Home additions extend the footprint of your home, so they involve foundation work, framing, roofing, insulation, mechanical systems, and exterior finishes. Weather conditions in Bloomington and Normal can influence the timeline, especially during colder months when foundation or exterior work may slow. Once enclosed, interior construction continues at a more predictable pace.

Whole Home Renovation Timeline

Typical Duration: 5 to 12 months

Whole home renovations involve many moving parts. These projects typically include multiple bathrooms, a kitchen, flooring changes, layout reconfigurations, and mechanical updates. Homeowners often live off-site during these remodels, which can help speed progress. A detailed pre-construction plan is the key to keeping large-scale renovations on track.

What Impacts Your Remodel Timeline

Remodeling timelines vary, but several factors consistently influence how long a project takes in Bloomington and Normal.

Scope of Work
The more structural and layout changes involved, the longer the project will take. A remodel that includes wall removal, electrical relocation, or plumbing rerouting naturally extends the schedule.

Age and Condition of the Home
Many homes in Central Illinois that were built between the 1980s and early 2000s need behind-the-wall updates. Electrical panels, plumbing systems, ductwork, and insulation can all require attention once construction begins.

Material Lead Times
Custom cabinetry, specialty fixtures, and unique finishes sometimes take longer to arrive. Early selection decisions shorten delays.

Local Permitting Requirements
Bloomington, Normal, Downs, Towanda, and other nearby towns have different permitting timelines. These can influence start dates.

Client Driven Changes
Changes to selections or plans after construction begins almost always add time. The more finalized decisions made during design, the smoother the build phase will be.

How Landmark’s Design Build Process Helps Keep Projects on Track

Landmark Construction uses a clear design-build system that guides your project from the first conversation through the final walkthrough. Every remodel begins with a complimentary in-home consult, followed by a detailed design package with drawings, selections, and 3D renderings. Once the design is approved, you receive a project proposal with accurate timelines, expectations, and next steps. During construction, Landmark manages scheduling, materials, inspections, and communication through the JobTread App so you always know what is happening and when.

Frequently Asked Questions

How far in advance should I start planning my remodel?

Most Bloomington Normal homeowners begin planning three to six months before they want construction to start. This allows enough time for design, selections, permitting, and scheduling. Starting early also reduces pressure and gives you more control over materials and layout decisions. If you want to remodel during a specific season, beginning even earlier is ideal.

Can I live in my home during a remodel?

Many homeowners stay in their homes during smaller or mid-sized renovations. However, large kitchen remodels, full main floor updates, or whole home renovations often require temporary relocation. Landmark will help you understand what to expect based on your specific project. Your ability to live on site often depends on how much of your home is affected.

Do remodels often take longer than expected?

Delays can happen in any remodel, but most scheduling issues come from material lead times, permitting delays, or discovering outdated systems behind the walls. Landmark’s detailed design phase significantly reduces surprises because decisions are made early and materials are ordered before construction begins. This structure helps make timelines more predictable.

When is the best time of year to remodel in Bloomington-Normal?

Spring and early fall are popular times to begin remodels because the weather is more predictable and many homeowners want projects completed before the holidays. Interior projects can take place year-round, but additions or major exterior work can be influenced by winter temperatures. Landmark will help you plan around any seasonal considerations.

How long does it take to get permits in Bloomington-Normal?

Permitting timelines vary depending on the project type and municipality. Some smaller remodels require simple permits that can be approved quickly, while structural changes or additions take longer. Our team handles permitting on your behalf and incorporates expected turnaround times into your overall project schedule.

Ready to Start Your Remodel?

If you are thinking about updating your home in Bloomington or Normal, the best next step is a conversation with the Landmark team. We will walk your space, discuss your goals, and outline a realistic timeline based on your project.

Schedule your complimentary consultation today and take the first step toward a home you will love living in.